Skip to content

Seperate Xiaopeng's rat during supervisor summerize #105

@nohelix

Description

@nohelix

Issue

Xiaopeng's rats are handled differently and no summary is needed. Is there a better way of assigning them separately to speed up the assignment process and not include data we don't need?

Desired Behavior

Ideal outcome would be to pull the assignments from Z:\Project Excels\GD_Grp1_Red_Teal_Lime.xlsx and just not have them show up in supervisor.xlsx, though it might need to be flexible for different work books to future proof.

  • This might have the negative downside of not showing warnings that ARE relevant like weight, but weight is typically currently checked using graphing feature in admin tools.
  • This is a special case just for Xiaopeng.

Next best would be a simplified different workbook without the summary that only lists the weight issues.

Metadata

Metadata

Assignees

No one assigned

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions