Skip to content

Alembic cleanup

Alembic cleanup #14

Triggered via push August 16, 2025 10:59
Status Failure
Total duration 17s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.10)
Process completed with exit code 30.
build (3.9)
The operation was canceled.
build (3.9)
The strategy configuration was canceled because "build._3_10" failed
build (3.8)
The operation was canceled.
build (3.8)
The strategy configuration was canceled because "build._3_10" failed