Skip to content

Latest commit

 

History

History
46 lines (32 loc) · 1.45 KB

File metadata and controls

46 lines (32 loc) · 1.45 KB

Medical Instrument Assembly Building

This project have been made for the company Erba Mannheim which deals with production of instrument for blood and urine analysis. Due to grow up number of contracts it was decided to usage a abandoned floor and where build up a new assembly line for a mass production.

I was entrusted to make layout of this object. From among huge amount of requirements I could appoint Particulary attention was dedicated to a comfort and safety for workers.

Main view

Top View

Department of Design&Quality

Storage Systems

Quality check room

Quality check room (detail)

Assembly line