chore: use import absolute.path as module syntax for pb2 imports #5744
Triggered via pull request
January 30, 2026 23:18
Status
Cancelled
Total duration
4m 28s
Artifacts
–
tests.yaml
on: pull_request
all_python_setup
3s
python_config
3s
docs
29s
docfx
35s
showcase-unit-add-iam-methods
1m 6s
integration
3m 55s
goldens-lint
4m 5s
goldens-unit
2m 31s
goldens-prerelease
48s
lint
22s
Matrix: showcase-mtls
Matrix: showcase-mypy
snippetgen
44s
Matrix: fragment
Matrix: mypy
Matrix: showcase-unit
Matrix: unit
Matrix: showcase
Annotations
22 errors
|
unit (3.14)
Process completed with exit code 1.
|
|
goldens-prerelease
Process completed with exit code 1.
|
|
unit (3.13)
The strategy configuration was canceled because "unit._3_14" failed
|
|
unit (3.13)
The operation was canceled.
|
|
unit (3.7)
The strategy configuration was canceled because "unit._3_14" failed
|
|
unit (3.7)
The operation was canceled.
|
|
unit (3.10)
The strategy configuration was canceled because "unit._3_14" failed
|
|
unit (3.10)
The operation was canceled.
|
|
unit (3.12)
The strategy configuration was canceled because "unit._3_14" failed
|
|
unit (3.12)
The operation was canceled.
|
|
unit (3.8)
The strategy configuration was canceled because "unit._3_14" failed
|
|
unit (3.8)
The operation was canceled.
|
|
unit (3.11)
The strategy configuration was canceled because "unit._3_14" failed
|
|
unit (3.11)
The operation was canceled.
|
|
unit (3.9)
The strategy configuration was canceled because "unit._3_14" failed
|
|
unit (3.9)
The operation was canceled.
|
|
showcase (3.14, showcase_w_rest_async)
Event loop is closed
|
|
integration
Canceling since a higher priority waiting request for tests-update-import-statements-for-pb exists
|
|
integration
The operation was canceled.
|
|
goldens-lint
Canceling since a higher priority waiting request for tests-update-import-statements-for-pb exists
|
|
goldens-lint
The operation was canceled.
|
|
Tests
Canceling since a higher priority waiting request for tests-update-import-statements-for-pb exists
|