Diff Experiment: Librarian with ruff updates #11740
Triggered via pull request
February 2, 2026 23:52
Status
Failure
Total duration
6h 5m 3s
Artifacts
–
unittest.yml
on: pull_request
Matrix: unit
Matrix: unit-core-deps-from-source
Matrix: unit-prerelease
cover
Annotations
16 errors
|
unit (3.8)
Process completed with exit code 1.
|
|
unit (3.11)
The strategy configuration was canceled because "unit._3_8" failed
|
|
unit (3.11)
The operation was canceled.
|
|
unit (3.10)
The strategy configuration was canceled because "unit._3_8" failed
|
|
unit (3.10)
The operation was canceled.
|
|
unit (3.14)
The strategy configuration was canceled because "unit._3_8" failed
|
|
unit (3.14)
The operation was canceled.
|
|
unit (3.12)
The strategy configuration was canceled because "unit._3_8" failed
|
|
unit (3.12)
The operation was canceled.
|
|
unit (3.13)
The strategy configuration was canceled because "unit._3_8" failed
|
|
unit (3.13)
The operation was canceled.
|
|
unit (3.9)
The strategy configuration was canceled because "unit._3_8" failed
|
|
unit (3.9)
The operation was canceled.
|
|
unit (3.7)
The strategy configuration was canceled because "unit._3_8" failed
|
|
unit (3.7)
The operation was canceled.
|
|
core_deps_from_source-3.14
The job has exceeded the maximum execution time of 6h0m0s
|