Skip to content

build(deps): bump org.pitest:pitest-maven from 1.17.4 to 1.20.1 #2459

build(deps): bump org.pitest:pitest-maven from 1.17.4 to 1.20.1

build(deps): bump org.pitest:pitest-maven from 1.17.4 to 1.20.1 #2459

Triggered via pull request August 11, 2025 18:11
Status Failure
Total duration 3m 42s
Artifacts

ci.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (8)
Process completed with exit code 1.
build (23)
The operation was canceled.
build (23)
The strategy configuration was canceled because "build._8" failed
build (11)
The operation was canceled.
build (11)
The strategy configuration was canceled because "build._8" failed
build (21)
The operation was canceled.
build (21)
The strategy configuration was canceled because "build._8" failed