Merge pull request #7040 from syncfusion-content/989389-scheduling-tasks
989389: Content check in blazor platform
2 parents 0b57f7c + 56e0a32 commit 256d415

File tree

8 files changed

+248
-209
lines changed

8 files changed

+248
-209
lines changed

blazor/gantt-chart/holidays.md

Lines changed: 41 additions & 29 deletions
Original file line numberDiff line numberDiff line change
@@ -1,28 +1,45 @@
11
---
22
layout: post
33
title: Holidays in Blazor Gantt Chart Component | Syncfusion
4-
description: Checkout and learn here all about Holidays in Syncfusion Blazor Gantt Chart component and much more.
4+
description: Learn how to configure holidays in the Syncfusion Blazor Gantt Chart component for accurate task scheduling with non-working days.
55
platform: Blazor
66
control: Gantt Chart
77
documentation: ug
88
---
99

1010
# Holidays in Blazor Gantt Chart Component
1111

12-
Non-working days in a project can be displayed in the Gantt Chart component using the [GanttHolidays](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.GanttHolidays.html) property. Each holiday can be defined with the following properties:
12+
The Blazor Gantt Chart component supports holidays to define non-working days, such as national holidays or company closures, that impact task scheduling and project timelines. Holidays override regular working time settings like [WorkWeek](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.SfGantt-1.html#Syncfusion_Blazor_Gantt_SfGantt_1_WorkWeek) or [IncludeWeekend](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.SfGantt-1.html#Syncfusion_Blazor_Gantt_SfGantt_1_IncludeWeekend), ensuring tasks do not progress during these periods. In the timeline, holidays appear as highlighted backgrounds with descriptive labels, creating visible gaps in taskbars to reflect scheduling adjustments. Custom CSS classes allow distinct styling for different holiday types (e.g., national vs. company holidays), enhancing visual clarity. Properly configured holidays ensure accurate duration calculations, dependency adjustments, and critical path analysis, aligning project timelines with resource availability and regional requirements.
1313

14-
* `From`: Defines start date of the holiday(s).
15-
* `To`: Defines end date of the holiday(s).
16-
* `Label`: Defines the description or label for the holiday.
17-
* `CssClass`: Formats the holidays label in the Gantt chart.
14+
## Understanding holiday effects on tasks
1815

19-
The following code example shows how to display the non-working days in the Gantt Chart component.
16+
Holidays adjust task scheduling to reflect non-working periods:
17+
- **Duration adjustments**: Task durations exclude holidays, extending end dates. For example, a task starting December 20, 2024, skips a December 25-26 holiday, adjusting its completion to account for these days.
18+
- **Dependency management**: Successor tasks shift to maintain relationships (e.g., FS), ensuring no work occurs during holidays.
19+
- **Critical path integration**: Holidays impact slack calculations when using [EnableCriticalPath](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.SfGantt-1.html#Syncfusion_Blazor_Gantt_SfGantt_1_EnableCriticalPath), as tasks delayed by holidays may become critical.
20+
- **Resource allocation**: Holidays reduce resource availability, pausing task progress during these periods.
21+
22+
The [ProjectStartDate](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.SfGantt-1.html#Syncfusion_Blazor_Gantt_SfGantt_1_ProjectStartDate) and [ProjectEndDate](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.SfGantt-1.html#Syncfusion_Blazor_Gantt_SfGantt_1_ProjectEndDate) properties provide context for scheduling, ensuring holidays align with the project timeline.
23+
24+
## Configure holidays
25+
26+
Holidays are defined using the [GanttHolidays](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.GanttHolidays.html) property, which accepts an array of holiday objects specifying dates, labels, and styling. Holidays take precedence over settings like `WorkWeek` or `IncludeWeekend`, ensuring tasks do not progress during these periods.
27+
28+
**Holiday configuration properties**
29+
- `From`: Sets the start date of the holiday (e.g., `new Date('2024-12-25')`).
30+
- `To`: Defines the end date for multi-day holidays (optional for single-day holidays).
31+
- `Label`: Provides a descriptive name (e.g., “Christmas Day”) displayed in the timeline.
32+
- `CssClass`: Applies custom CSS classes for styling holiday appearances.
33+
34+
The following example configures single and multi-day holidays:
35+
36+
{% tabs %}
37+
{% highlight razor tabtitle="Index.razor" %}
2038

21-
```cshtml
2239
@using Syncfusion.Blazor.Gantt
2340
<SfGantt DataSource="@TaskCollection" Height="450px" Width="900px">
24-
<GanttTaskFields Id="TaskId" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
25-
Duration="Duration" Progress="Progress" ParentID="ParentId">
41+
<GanttTaskFields Id="TaskID" Name="TaskName" StartDate="StartDate" EndDate="EndDate"
42+
Duration="Duration" Progress="Progress" ParentID="ParentID">
2643
</GanttTaskFields>
2744
<GanttHolidays>
2845
<GanttHoliday From="@Holiday1" To="@Holiday2" Label="Public holidays"
@@ -44,40 +61,35 @@ The following code example shows how to display the non-working days in the Gant
4461

4562
public class TaskData
4663
{
47-
public int TaskId { get; set; }
64+
public int TaskID { get; set; }
4865
public string TaskName { get; set; }
4966
public DateTime StartDate { get; set; }
5067
public DateTime? EndDate { get; set; }
5168
public string Duration { get; set; }
5269
public int Progress { get; set; }
53-
public int? ParentId { get; set; }
70+
public int? ParentID { get; set; }
5471
}
5572

5673
public static List<TaskData> GetTaskCollection()
5774
{
5875
List<TaskData> Tasks = new List<TaskData>()
5976
{
60-
new TaskData() { TaskId = 1, TaskName = "Project initiation", StartDate = new DateTime(2022, 04, 05), EndDate = new DateTime(2022, 04, 21), },
61-
new TaskData() { TaskId = 2, TaskName = "Identify Site location", StartDate = new DateTime(2022, 04, 05), Duration = "0", Progress = 30, ParentId = 1 },
62-
new TaskData() { TaskId = 3, TaskName = "Perform soil test", StartDate = new DateTime(2022, 04, 05), Duration = "4", Progress = 40, ParentId = 1 },
63-
new TaskData() { TaskId = 4, TaskName = "Soil test approval", StartDate = new DateTime(2022, 04, 05), Duration = "0", Progress = 30, ParentId = 1 },
64-
new TaskData() { TaskId = 5, TaskName = "Project estimation", StartDate = new DateTime(2022, 04, 06), EndDate = new DateTime(2022, 04, 21), },
65-
new TaskData() { TaskId = 6, TaskName = "Develop floor plan for estimation", StartDate = new DateTime(2022, 04, 06), Duration = "3", Progress = 30, ParentId = 5 },
66-
new TaskData() { TaskId = 7, TaskName = "List materials", StartDate = new DateTime(2022, 04, 06), Duration = "3", Progress = 40, ParentId = 5 },
67-
new TaskData() { TaskId = 8, TaskName = "Estimation approval", StartDate = new DateTime(2022, 04, 06), Duration = "0", Progress = 30, ParentId = 5 }
77+
new TaskData() { TaskID = 1, TaskName = "Project initiation", StartDate = new DateTime(2022, 04, 05), EndDate = new DateTime(2022, 04, 08), },
78+
new TaskData() { TaskID = 2, TaskName = "Identify Site location", StartDate = new DateTime(2022, 04, 05), Duration = "0", Progress = 30, ParentID = 1 },
79+
new TaskData() { TaskID = 3, TaskName = "Perform soil test", StartDate = new DateTime(2022, 04, 05), Duration = "4", Progress = 40, ParentID = 1 },
80+
new TaskData() { TaskID = 4, TaskName = "Soil test approval", StartDate = new DateTime(2022, 04, 05), Duration = "0", Progress = 30, ParentID = 1 },
81+
new TaskData() { TaskID = 5, TaskName = "Project estimation", StartDate = new DateTime(2022, 04, 06), EndDate = new DateTime(2022, 04, 08), },
82+
new TaskData() { TaskID = 6, TaskName = "Develop floor plan for estimation", StartDate = new DateTime(2022, 04, 06), Duration = "3", Progress = 30, ParentID = 5 },
83+
new TaskData() { TaskID = 7, TaskName = "List materials", StartDate = new DateTime(2022, 04, 06), Duration = "3", Progress = 40, ParentID = 5 },
84+
new TaskData() { TaskID = 8, TaskName = "Estimation approval", StartDate = new DateTime(2022, 04, 06), Duration = "0", Progress = 30, ParentID = 5 }
6885
};
6986
return Tasks;
7087
}
7188
}
72-
<style>
73-
.e-gantt .e-gantt-chart .e-custom-holiday {
74-
background-color: #e82869;
75-
}
76-
</style>
77-
```
7889

79-
The following screenshot shows the output of Holidays in Gantt Chart component.
90+
{% endhighlight %}
91+
{% endtabs %}
8092

81-
![Blazor Gantt Chart displays Holidays](images/blazor-gantt-chart-holidays.png)
93+
{% previewsample "https://blazorplayground.syncfusion.com/embed/hjryCZgZfnCCBAeu?appbar=false&editor=false&result=true&errorlist=false&theme=bootstrap5" %}
8294

83-
N> You can refer to our [Blazor Gantt Chart](https://www.syncfusion.com/blazor-components/blazor-gantt-chart) feature tour page for its groundbreaking feature representations. You can also explore our [Blazor Gantt Chart example](https://blazor.syncfusion.com/demos/gantt-chart/default-functionalities) to know how to render and configure the Gantt.
95+
> You can refer to our [Blazor Gantt Chart](https://www.syncfusion.com/blazor-components/blazor-gantt-chart) feature tour page for its groundbreaking feature representations. You can also explore our [Blazor Gantt Chart example](https://blazor.syncfusion.com/demos/gantt-chart/default-functionalities) to know how to render and configure the Gantt.
Binary file not shown.
3.63 KB
Loading
1.2 KB
Loading
1.2 KB
Loading

blazor/gantt-chart/predecessor-validation.md

Lines changed: 11 additions & 10 deletions
Original file line numberDiff line numberDiff line change
@@ -9,7 +9,7 @@ documentation: ug
99

1010
# Predecessor Validation
1111

12-
By default, Gantt tasks date values are validated based on predecessor values. You can disable/enable this validation by using the [EnablePredecessorValidation](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.SfGantt-1.html#Syncfusion_Blazor_Gantt_SfGantt_1_EnablePredecessorValidation) property. By default, `EnablePredecessorValidation` is true.
12+
By default, Gantt task date values are validated based on predecessor values. You can enable or disable this validation by using the [EnablePredecessorValidation](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.SfGantt-1.html#Syncfusion_Blazor_Gantt_SfGantt_1_EnablePredecessorValidation) property. By default, `EnablePredecessorValidation` is **true**.
1313

1414
{% tabs %}
1515
{% highlight razor tabtitle="Index.razor" %}
@@ -68,22 +68,22 @@ By default, Gantt tasks date values are validated based on predecessor values. Y
6868

6969
## Custom validation using TaskbarEditing event
7070

71-
In Gantt, the task relationship link can be broken by editing the start date, end date, and duration value of task. When the task relationship is broken on any edit action, it can be handled in Gantt in the following ways.
71+
In Gantt Chart, the task relationship link can be broken by editing the start date, end date, or duration of a task. When the task relationship is broken during any edit action, it can be handled in Gantt Chart in the following ways.
7272

7373
### Validation mode
7474

75-
When editing the tasks with predecessor links, then the [TaskbarEditing](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.GanttEvents-1.html#Syncfusion_Blazor_Gantt_GanttEvents_1_TaskbarEditing) event will be triggered. You can validate the editing action within the `TaskbarEditing` event using the [ValidateMode](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.ValidateMode.html) event argument. The `ValidateMode` event argument has the following properties:
75+
When editing tasks with predecessor links, the [TaskbarEditing](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.GanttEvents-1.html#Syncfusion_Blazor_Gantt_GanttEvents_1_TaskbarEditing) event is triggered. You can validate the editing action within the `TaskbarEditing` event using the [ValidateMode](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.ValidateMode.html) event argument. The `ValidateMode` argument provides the following properties:
7676

7777
Argument |Default value |Description
7878
-----|-----|-----
7979
args.ValidateMode.RespectLink | false | In this validation mode, the predecessor links get high priority. For example, in FS type, with this mode enabled, when the successor task is moved before the predecessor task’s end date, the editing will be reverted, and dates will be validated based on the dependency links.
8080
args.ValidateMode.PreserveLinkWithEditing | true | In this validation mode, the taskbar editing will be considered along with the dependency links. This relationship will be maintained by updating the offset value of predecessors.
8181

82-
By default, the `PreserveLinkWithEditing` validation mode will be enabled, so the predecessors are updated with offset values.
82+
By default, the [PreserveLinkWithEditing](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.ValidateMode.html#Syncfusion_Blazor_Gantt_ValidateMode_PreserveLinkWithEditing) validation mode is enabled, so the predecessors are updated with offset values.
8383

8484
![Blazor Gantt Chart updating offset on edit actions](images/blazor-gantt-chart-preserve-link-with-editing.gif)
8585

86-
The following code example explains enabling the `RespectLink` validation mode while editing the linked tasks in the `TaskbarEditing` event.
86+
The following code example explains enabling the [RespectLink](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.ValidateMode.html#Syncfusion_Blazor_Gantt_ValidateMode_RespectLink) validation mode while editing the linked tasks in the [TaskbarEditing](https://blazor.syncfusion.com/documentation/gantt-chart/events#taskbarediting) event.
8787

8888
{% tabs %}
8989
{% highlight razor tabtitle="Index.razor" %}
@@ -144,8 +144,9 @@ The following code example explains enabling the `RespectLink` validation mode w
144144

145145
### Predecessor offset validation
146146

147-
On taskbar editing, the [TaskbarEditing](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.GanttEvents-1.html#Syncfusion_Blazor_Gantt_GanttEvents_1_TaskbarEditing) event will be triggered with [EnablePredecessorOffsetValidation](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.TaskbarEditingEventArgs-1.html#Syncfusion_Blazor_Gantt_TaskbarEditingEventArgs_1_EnablePredecessorOffsetValidation) argument. When `EnablePredecessorOffsetValidation` is enabled, the taskbar can be dragged such that it does not violate the predecessor value.
148-
The taskbar can be dragged above the given predecessor offset value and it gets reverted to the minimum predecessor value if dragged below the predecessor offset value.
147+
When editing a taskbar, the [TaskbarEditing](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.GanttEvents-1.html#Syncfusion_Blazor_Gantt_GanttEvents_1_TaskbarEditing) event is triggered with the [EnablePredecessorOffsetValidation](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.TaskbarEditingEventArgs-1.html#Syncfusion_Blazor_Gantt_TaskbarEditingEventArgs_1_EnablePredecessorOffsetValidation) argument. When `EnablePredecessorOffsetValidation` is enabled, the taskbar can be dragged without violating the predecessor offset value.
148+
149+
The taskbar can be moved above the specified predecessor offset value, but if it is dragged below the offset value, it will revert to the minimum predecessor value.
149150

150151
{% tabs %}
151152
{% highlight razor tabtitle="Index.razor" %}
@@ -212,9 +213,9 @@ N> When `EnablePredecessorOffsetValidation` is enabled, the predecessor offset w
212213

213214
### Auto-link validation
214215

215-
When the connector lines are drawn between tasks, the task date gets validated based on predecessor values. You can restrict this validation on predecessor drawing using the [TaskbarEditing](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.GanttEvents-1.html#Syncfusion_Blazor_Gantt_GanttEvents_1_TaskbarEditing) event. You can enable/disable the validation using [EnablePredecessorValidation](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.TaskbarEditingEventArgs-1.html#Syncfusion_Blazor_Gantt_TaskbarEditingEventArgs_1_EnablePredecessorValidation) event argument. By default, `EnablePredecessorValidation` is true.
216+
When connector lines are drawn between tasks, the task dates are validated based on predecessor values. You can restrict this validation when drawing predecessors by using the [TaskbarEditing](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.GanttEvents-1.html#Syncfusion_Blazor_Gantt_GanttEvents_1_TaskbarEditing) event. You can enable or disable the validation using the [EnablePredecessorValidation](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.TaskbarEditingEventArgs-1.html#Syncfusion_Blazor_Gantt_TaskbarEditingEventArgs_1_EnablePredecessorValidation) event argument. By default, `EnablePredecessorValidation` is **true**.
216217

217-
In the below code example, the connector line which is connected from task id 2 to task id 3 is rendered at load time. Hence validation happens. Whereas, the connector line from task id 6 to task id 7 is drawn dynamically and validation is restricted here by disabling the `EnablePredecessorValidation` property.
218+
In the following code example, the connector line connected from task ID 2 to task ID 3 is rendered at load time, so validation occurs. However, the connector line from task ID 6 to task ID 7 is drawn dynamically, and validation is restricted by disabling the `EnablePredecessorValidation` property.
218219

219220
{% tabs %}
220221
{% highlight razor tabtitle="Index.razor" %}
@@ -276,4 +277,4 @@ In the below code example, the connector line which is connected from task id 2
276277

277278
{% previewsample "https://blazorplayground.syncfusion.com/embed/rNBICtjghxOULcTL?appbar=false&editor=false&result=true&errorlist=false&theme=bootstrap5" %}
278279

279-
N> [EnablePredecessorValidation](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.SfGantt-1.html#Syncfusion_Blazor_Gantt_SfGantt_1_EnablePredecessorValidation) API is used to enable/disable validation based on predecessor values both on load time and on edit actions like cell editing, dialog editing, and on predecessor drawing. Whereas, [EnablePredecessorValidation](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.TaskbarEditingEventArgs-1.html#Syncfusion_Blazor_Gantt_TaskbarEditingEventArgs_1_EnablePredecessorValidation) event argument is used to enable/disable validation only on predecessor drawing.
280+
> [EnablePredecessorValidation](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.SfGantt-1.html#Syncfusion_Blazor_Gantt_SfGantt_1_EnablePredecessorValidation) API is used to enable/disable validation based on predecessor values both on load time and on edit actions like cell editing, dialog editing, and on predecessor drawing. Whereas, [EnablePredecessorValidation](https://help.syncfusion.com/cr/blazor/Syncfusion.Blazor.Gantt.TaskbarEditingEventArgs-1.html#Syncfusion_Blazor_Gantt_TaskbarEditingEventArgs_1_EnablePredecessorValidation) event argument is used to enable/disable validation only on predecessor drawing.

0 commit comments