Skip to content

[25.11] traccar: 6.10.0 -> 6.12.2#495871

Open
frederictobiasc wants to merge 3 commits intoNixOS:release-25.11from
frederictobiasc:backport-traccar
Open

[25.11] traccar: 6.10.0 -> 6.12.2#495871
frederictobiasc wants to merge 3 commits intoNixOS:release-25.11from
frederictobiasc:backport-traccar

Conversation

@frederictobiasc
Copy link
Contributor

@frederictobiasc frederictobiasc commented Mar 2, 2026

Original PR:
#492972

Supersedes #494250

closes vulnerabilities: #493814, #493817, #493818, #493819

Things done

  • Built on platform:
    • x86_64-linux
    • aarch64-linux
    • x86_64-darwin
    • aarch64-darwin
  • Tested, as applicable:
  • Ran nixpkgs-review on this PR. See nixpkgs-review usage.
  • Tested basic functionality of all binary files, usually in ./result/bin/.
  • Nixpkgs Release Notes
    • Package update: when the change is major or breaking.
  • NixOS Release Notes
    • Module addition: when adding a new NixOS module.
    • Module update: when the change is significant.
  • Fits CONTRIBUTING.md, pkgs/README.md, maintainers/README.md and other READMEs.

github-actions[bot]

This comment was marked as outdated.

(cherry picked from commit ff4c180)
@github-actions github-actions bot dismissed their stale review March 2, 2026 15:49

Review dismissed automatically

@frederictobiasc frederictobiasc added the 1.severity: security Issues which raise a security issue, or PRs that fix one label Mar 2, 2026
@nixpkgs-ci nixpkgs-ci bot added 8.has: package (update) This PR updates a package to a newer version 10.rebuild-linux: 1-10 This PR causes between 1 and 10 packages to rebuild on Linux. 10.rebuild-darwin: 1-10 This PR causes between 1 and 10 packages to rebuild on Darwin. 11.by: package-maintainer This PR was created by a maintainer of all the package it changes. 10.rebuild-darwin: 1 This PR causes 1 package to rebuild on Darwin. 10.rebuild-linux: 1 This PR causes 1 package to rebuild on Linux. 9.needs: reviewer This PR currently has no reviewers requested and needs attention. 4.workflow: backport This targets a stable branch labels Mar 2, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

1.severity: security Issues which raise a security issue, or PRs that fix one 4.workflow: backport This targets a stable branch 8.has: package (update) This PR updates a package to a newer version 9.needs: reviewer This PR currently has no reviewers requested and needs attention. 10.rebuild-darwin: 1-10 This PR causes between 1 and 10 packages to rebuild on Darwin. 10.rebuild-darwin: 1 This PR causes 1 package to rebuild on Darwin. 10.rebuild-linux: 1-10 This PR causes between 1 and 10 packages to rebuild on Linux. 10.rebuild-linux: 1 This PR causes 1 package to rebuild on Linux. 11.by: package-maintainer This PR was created by a maintainer of all the package it changes.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants