-
Notifications
You must be signed in to change notification settings - Fork 55
Pull requests: openshift/ptp-operator
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
OCPBUGS-70071: Updating ptp-operator-must-gather-container image to be consistent with ART for 4.22
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
verified
Signifies that the PR passed pre-merge verification criteria
#649
opened Dec 20, 2025 by
openshift-bot
Loading…
OCPBUGS-66972: Ntpfailover backport 418
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/invalid-bug
Indicates that a referenced Jira bug is invalid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
verified
Signifies that the PR passed pre-merge verification criteria
verified-later
#646
opened Dec 5, 2025 by
josephdrichard
Loading…
OCPBUGS-66970: Ntpfailover backport 419
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/invalid-bug
Indicates that a referenced Jira bug is invalid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
verified
Signifies that the PR passed pre-merge verification criteria
verified-later
#645
opened Dec 5, 2025 by
josephdrichard
Loading…
Bump golang.org/x/crypto from 0.36.0 to 0.45.0 in the go_modules group across 1 directory
dependencies
Pull requests that update a dependency file
go
Pull requests that update go code
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
#641
opened Nov 20, 2025 by
dependabot
bot
Loading…
[WIP] Add mTLS and OAuth authentication to PTP event publisher
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
lifecycle/stale
Denotes an issue or PR has remained open with no activity and has become stale.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#632
opened Sep 17, 2025 by
jzding
Loading…
ProTip!
Find all pull requests that aren't related to any open issues with -linked:issue.